Update the Contents of Only One Drawing Sheet

General

  • You can update only the contents of the selected drawing sheet instead of the entire drawing.
    • This can be relevant to speed up work if the model is large and contains several drawing sheets in the same drawing.

Header

  1. Open the list of drawing sheets in the drawing tree Drawing Sheets
  2. Select the drawing sheet.
    • The program dims the other drawing sheets.
  3. Select the context-sensitive function Update .
    • Only projections within the selected drawing sheet are updated.