Panel Schedule

Framer

Add a panel schedule to the floor plan. The schedule will be automatically updated, if the panel labels or the number of panels change.

  1. Select Output | Panels and Trusses | Schedule.
  2. Select the panel type from the list, for example Floor Panels. The program finds all the panels of the selected type from the model.
  3. Confirm by clicking OK.
  4. Select a location for the schedule in the floor plan drawing.