Panel Schedule
Framer
Add a panel schedule to the floor plan. The schedule will be automatically updated, if the panel labels or the number of panels change.
- Select Output | Panels and Trusses | Schedule.
- Select the panel type from the list, for example Floor Panels. The program finds all the panels of the selected type from the model.
- Confirm by clicking OK.
- Select a location for the schedule in the floor plan drawing.