Multiple Locations
By using the auxiliary function Multiple Locations, you can add the selected sub project or building group in a chain of several copies.
- Type the number of sub projects or building groups in a separate text box.
- The layout will be displayed in a separate drawing window, in which you can determine the offset between the copies. Select the offset by clicking the following points in the layout:
- Reference point (A) = the reference point of the next copy and
- Position (B) = the point in which the reference point will be located in the last copy.
- Select the position of the first copy. The rest of the copies will be located with the reference point of the next copy in the position determined in the last copy. If you defined a label for the sub project, the program automatically numbers the sub projects starting from the number you entered.