Select the sub project or building group project to be added to the main project in the dialog box. Select the desired drawing file, model file or both from the drawing-model pairs of the project.
Dialog Box Options
- Project
- Select the sub project or building group project in one of the following ways:
-
- Select a project from the list. All the projects in the project directory are gathered on the list.
- Click the Browse button and select the project in a dialog box. You can search for a project on the basis of search criteria, or you can sort the projects into groups according to the sorting attributes you choose. When you are selecting a building group project, select the saving location BLDG_GROUPS in the dialog box.
- Open Project / Select Project to Copy Dialog Box
- Identification
- You can define a label, or a number, for the sub project. The label is displayed in the floor plan and the material report. The label can be formed of a prefix and a sequential number, for example Flat_1.
- When you are adding the sub project for the first time, type the label of the first sub project in the field. The program automatically numbers the other sub projects in sequential order. In other words, each sub project has a label of its own, even if the same sub project would be used.
- Next time you select the sub project adding function, the next available number is the default label in the dialog box. If you try to assign an existing label to a sub project, the program will automatically find the next available number.
- You can move the label from the grip point.
- If you leave the field empty, a label is not added.
- Image
- Select a drawing file of the project from the list.
- Model
- Select a model file of the project from the list.