Update the Profile Schedule
Architectural, Framer
You can use the function Output | Profiles | Schedule > Update to update the following changes to the profile schedule added to the floor plan:
- You have added or deleted a profile.
- You have changed the length, cross section or other listed property of a profile.
- You have edited the drawing properties of the schedules in the system settings.
The function updates all the schedules in the drawing-model pairs of the project, where the profiles of a specific group have been collected, for example BEAMS, COLUMNS, FLOOR JOISTS, etc. A list containing the profiles the user has selected individually is not updated.
Note:
- By default, the function also updates the profile codes when you add or delete a profile. Updating the codes is defined in the system settings with the keyword upd_pce_labels_during_schedule_upd.
- upd_pce_labels_during_schedule_upd = 0 - The codes are not updated.
- upd_pce_labels_during_schedule_upd = 1 - The codes are updated.
- Updating the codes in connection with solving options is defined in the system settings with the keyword upd_piece_schedules_during_testing.
- upd_piece_schedules_during_testing = 0 - The user is asked if the schedules are updated when the options are solved.
- upd_piece_schedules_during_testing = 1 - The schedules are updated when the options are solved. Default value.
- upd_piece_schedules_during_testing = -1 - The schedules are not updated when the options are solved.