Beam Panel Schedule

Framer

You can add a schedule of the beam panels to the floor plan. The function also updates the panel drawings of the beam panels.

  1. Select Output | Profiles | Schedule.
  2. Select BEAM PANELS from the list.
  3. If generating the schedule for the first time, click its location.

You can update the schedule by reselecting the function.

Note:
  • You also update the panel drawing of a beam panel functioning as a sub panel by generating the panel's part drawings.